Together with PT INTI (Persero), SEDAYU built Jeret Offgrid Solar Power Plant for the Ministry of Energy and Mineral Resources (ESDM) to provide the much-needed electricity for the people in Halmahera Selatan.

Located in Halmahera Selatan, Jeret is part of the outer islands in Eastern Indonesia where infrastructure, especially electricity, is one of the biggest challenges to develop the region. Previously using expensive and unreliable Diesel Power Plant, the people of Jeret now uses the clean energy generated from Jeret Off-grid Solar Power Plant.

Designed, installed and commissioned by PT INTI and PT SEDAYU on-time on-budget using locally-assembled solar modules, Jeret Off-grid Solar Power Plant succesfully provides the electricity for more than 200 households and at the same time, reducing the cost of electricity.

Keahlian

Diposting pada

17 Maret 2020

Kirim Komentar

Alamat email Anda tidak akan dipublikasikan. Ruas yang wajib ditandai *

Keahlian

Diposting pada

17 Maret 2020