BUMI RATU OFFGRID SOLAR POWER PLANT IN LAMPUNG BARAT (2013)

BUMI RATU OFFGRID SOLAR POWER PLANT IN LAMPUNG BARAT (2013)

Together with PT INTI (Persero), SEDAYU built Bumi Ratu Off-grid Solar Power Plant for the Ministry of Energy and Mineral Resources (ESDM) to provide the much-needed electricity for the people in Lampung Tengah.

Despite its proximity to Java and the nearest transmission grid, there are villages in Lampung Tengah still not connected to the grid and relying on expensive and hard-to-get kerosene lamps due to its remote location and limited transportation to the area. Hence, the logistic to transport all Solar Power Plant components to the projec site was the main challenge in this project.

Designed, installed and commissioned by PT INTI and PT SEDAYU on-time on-budget using locally-assembled solar modules, Bumi Ratu Off-grid Solar Power Plant succesfully provides the electricity for more than 200 households and at the same time, reducing the cost of electricity.

Skills

Posted on

21 November 2018

Submit a Comment

Your email address will not be published. Required fields are marked *

Skills

Posted on

21 November 2018