HYBRID SOLAR POWER

HOW THE SYSTEM WORKS

BENEFITS

power-independence

Power independence

day-night

Sustainable energy day and night

fluktuatif

Reduces power consumption
from the grid

free-power25

Free power for +25 years

POWER APPLICATION

1. Factory

With the absence of reliable electricity in the area, PLN Gorontalo Biomass Power Plant opts to use 45 kWp Rooftop Solar Power System to support its electricity needs. Designed, installed and commissioned on-schedule by PT Selaras Daya Utama in 2014, the project serves as the model to use Solar Power for industrial needs.

2. Farming/Mining

With the absence of reliable electricity in the area the Ministry of Energy and Mineral Resources (ESDM) opts to use a 75 kWp Hybrid Solar Power System to support its electricity needs in Bumi Ratu, Lampung. The project serves as the model to use Solar Power for Farming/Mining areas where electricity is needed